Dodger Stadium featuring Plaster X-Mold
Being big Dodger Fans, the team at Flannery was ecstatic to have the opportunity to be a part of the Dodger Stadium renovation. Dodger Stadium has been a landmark in the greater Los Angeles area for over 52 years and underwent an unprecedented $150 million renovation. The renovation gave a nod to the team’s history and special emphasis was given to enhance the fans’ overall experience.
Flannery Trim shipped over 6,000 lineal feet of its Plaster X-Mold to the stadium. It was used throughout all of the restrooms as a corner trim accent at the entrances. Utilized to construct the door frame, the trim was combined with a plaster wall system to create an aesthetic reveal at the outside corner details. The trim was also utilized around the sinks and stalls to soften the hard concrete interior of the stadium.